Slabs

Dean and Deluca

Dean and Deluca slab strengthening

Tyfo Fibrwrap Systems were able to work and design around the penetrations, and provide the required positive and negative flexural enhancement.

Project PDF File

Central Avenue Bridge

Central Avenue Bridge slab strengthening

The carbon-based Tyfo SCH-41 Composite System was utilized on the bottom side of the slab to strengthen areas lacking positive moment reinforcement.

Project PDF File

Drake Library Slab Strengthening

Drake Library slab stengthening

The roof slab had to be strengthened in the positive, negative and moment areas using Tyfo UC Strips.

Project PDF File

Austin Energy

no-image

Fibrwrap used for PCB containment by Delta Structural Technologies.

Project PDF File

Fox Plaza

no-image

Corrosion at Balcony rail post locations was causing a dangerous spalling condition on this 20-story high rise. Concrete repair and Fibrwrap was used at each post location to prevent future spalling.

Project PDF File

Getty Villa

no-image

Flexural Capacity enhancement using Fibrwrap.

Project PDF File

Italian Autostrada

no-image

Crack Mitigation using TYFO Web composite on a roadway tunnel.

Project PDF File

KBP Coil Factory

no-image

Roof strengthening using the Fibrwrap System. Awarded the "2003 Project of the Year" by the Rocky Mountain Chapter of ICRI.

Project PDF File

La Jolla Galleria

no-image

Addition of a topping slab was going to overload the existing slab. Fibrwrap was used for strengthening.

Project PDF File

Navy Pier

no-image

The change from a 30-ton crane to a 50-ton crane required flexural slab strengthening on this Navy Pier in San Diego. The Fibrwrap System was used to strengthen the slab for the additional capacity requirements.

Project PDF File

Oregon Paper Mill

no-image

Additional strengthening on a two-way slab for both positive and negative moment due to overstressing of the existing slab.

Project PDF File

Sears Lofts

no-image

This wharehouse was rehabilitated for a condo conversion in downtown Oakland, California. The two-way slab was strengthened with Fibrwrap for negative moment.

Project PDF File

Wal-Mart La Mesa

no-image

The existing second floor slab was not sufficient to carry the loads from a newly installed storage racks at this Wal-Mart. The slab required various amounts of strengthening depending on the location and the loading requirements. Fibrwrap provided a fast and cost-effective solution.

Project PDF File

Zorinsky Federal Building

no-image

The cutting of an opening for a new stairwell in this two-way waffle slab create a defficiency in the system. Fibrwrap was installed to provide reinforcement around the new penetration.

Project PDF File