Force Protection / Blast Mitigation
Wells Blue Bunny Factory
The potential for a blast at this ice cream factory was the impetus for this retrofit. The Fibrwrap System provided the needed blast resistance for the block walls in the control room.
The potential for a blast at this ice cream factory was the impetus for this retrofit. The Fibrwrap System provided the needed blast resistance for the block walls in the control room.