Buildings

Brittania Mine Museum

2025 South Figueroa column strengthening

A custom solution was developed utilizing Tyfo SEH-51A System over 100% (2,800 square feet) of the interior face of the unreinforced concrete block wall.

Project PDF File

Slaughter Residence

2025 South Figueroa column strengthening

The Tyfo SCH-41-2X System provided the required additional flexural capacity for the CMU walls and pilasters.

Project PDF File

Clinical Services Block Building

2025 South Figueroa column strengthening

Shear walls required a seismic upgrade and local strengthening to holes cut for new penetrations.

Project PDF File

2025 South Figueroa

2025 South Figueroa column strengthening

Column strengthening on an old building requiring a seismic upgrade.

Project PDF File

Beverly Hills Hilton

Beverly Hills Hilton beam strengthening

Large reinforced concrete beams were brought up to the current seismic code during some major remodeling work.

Project PDF File

Corona Del Mar

Corona Del Mar column strengthening

The glass-based Tyfo SEH-51A System was used to wrap the columns to provide the required shear confinement.

Project PDF File

Sea World Diver Locker Slab Strengthening

Sea World Diver Locker Slab Strengthening

The Tyfo Fibrwrap System provided positive moment strengthening around the underside of the newly cut openings..

Project PDF File

City Center Column Strengthening

City Center Column Strengthening

Tyfo SCH System jackets were installed on the columns to provide the adequate transverse reinforcement.

Project PDF File

Northwood Manor Slab Strengthening

Embassy Suites Hotel Columns Seismic Retrofit

The Tyfo SCH-41 Composite System along with the Tyfo SCH Fibr Anchors were installed to supplement the required additional negative moment capacity.

Project PDF File

Embassy Suites Hotel Columns Seismic Retrofit

Embassy Suites Hotel Columns Seismic Retrofit

A seismic retrofit was performed to bring the building up to the current seismic code requirements.

Project PDF File

UCR Culver Arts Center Wall Strengthening

UCR Culver Arts Center Wall Strengthening

The Tyfo SEH-51A System was installed both in the horizontal and vertical direction to provide the adequate required reinforcing on the concrete wall.

Project PDF File

Encore Hotel Slab Strengthening

Encore Hotel slab stengthening

The carbon-based Tyfo SCH-41S-1 System installed on top of the existing slab locations provided the required negative moment flexural capacity.

Project PDF File

1617 E. Ball Road Glulam Beam Strengthening

1617 E. Ball Road Glulam Beam Strengthening

Tyfo SCH-41-2X System was applied to the underside of the beams to enhance their flexural capacity.

Project PDF File

Mackey Elementary Glulam Beam Strengthening

Mackey Elementary Timber Beam Strengthening

Glulam beams were strengthened in the longitudinal and transverse directions, to restore the beams back to their original flexural moment and shear capacity.

Project PDF File

San Diego City College Building P Expansion and Renovation

San Diego City College Building P Expansion and Renovation

Additional positive flexural strength was provided due to new gravity loads, and reinforced concrete walls were strengthened to fulfill stabilization and life safety requirements.

Project PDF File

Vancouver Technical Schools Seismic Retrofit

Vancouver Technical Schools Seismic Retrofit

The roof slab had to be strengthened in the positive, negative and moment areas using Tyfo UC Strips.

Project PDF File

Drake Library Slab Strengthening

Drake Library slab stengthening

The roof slab had to be strengthened in the positive, negative and moment areas using Tyfo UC Strips.

Project PDF File

Kansas City Music Hall Slab Strengthening

Kansas City Music Hall Slab Strengthening

The Tyfo SCH-41 System reinforced the slabs for flexure, the Tyfo SEH-51 System reinforced the beams to upgrade shear capacity and the Tyfo AFP System achieved the required UL 2-hour fire-rating.

Project PDF File

Natural History Museum Cold Joint Shear Transfer

Natural History Museum Cold Joint Shear Transfer

The glass-based Tyfo BC System, oriented in the ± 45º direction, was installed above and below the subject cold joint to provide the required strengthening. Tyfo SEH Fibr™ Anchors were also placed above the cold joint.

Project PDF File

Schlegel Studios, Burbank Wall CMU Wall Strengthening

Schlegel Studios, Burbank Wall CMU Wall Strengthening

The Tyfo SCH-41S System, a carbon-base composite with aramid cross fibers, was utilized along the interior and exterior faces of the walls, providing the shear strengthening required.

Project PDF File

Lake City Drive Column Strengthening

Lake City Drive Column Strengthening

The Tyfo SCH-41 System was installed to supplement the required confinement reinforcement to the columns.

Project PDF File

BYU Manwaring Student Center CMU Wall Strengthening

BYU Manwaring Student Center wall strengthening

Additional in-plane shear strength for CMU walls was provided as part of a seismic upgrade to the student center.

Project PDF File

Dean and Deluca Slab Strengthening

Dean and Deluca slab strengthening

Tyfo Fibrwrap Systems were able to work and design around the penetrations, and provide the required positive and negative flexural enhancement.

Project PDF File

Home and Care Center Floor Strengthening

Home and Care Center floor strengthening

The Tyfo SCH-41 Composite System was installed at the bottom of the joist ends to provide strength to the joist ends and supplement possible corroded rebar.

Project PDF File

Hotel Georgia Slab Strengthening

Hotel Georgia Slab Strengthening

The Tyfo SCH-41 System was installed to supplement the required flexural enhancement.

Project PDF File

Cyclotron/Radiopharmacy Wall Strengthening

Cyclotron/Radiopharmacy Wall Strengthening

The Tyfo SCH-41-2X System was installed to supplement the in-plane shear requirement.

Project PDF File

Chambers Hotel Slab Strengthening

Chambers Hotel Slab Strengthening

The carbon-based Tyfo SCH-41 Composite System was used to increase the flexural capacity of the two-way slabs.

Project PDF File

Wal-Mart Two –Way Slab Strengthening

Wal-Mart Two –Way Slab Strengthening

The Tyfo SCH-41 System was installed, which allowed new loads on the slab for the storage of merchandise above.

Project PDF File

Dearborn Housing

Dearborn Housing beam-column repair

Multi-story buildings that experienced severe cracking at the beam/column joints.

Project PDF File

Arkansas Studies Institute

Arkansas Studies Institute slab strengthening

The project involved the conversion of an existing building into a library.

Project PDF File

Infant Welfare Society

Infant Welfare Society beam strengthening

Beams strengthened on a building being converted into an office building.

Project PDF File

Canoe Slalom Facilities

no-image

Olympic Canoe Slalom in Athens, Greece. Columns strengthened for additional axial loading.

Project PDF File

Centinela Hospital

no-image

Both Columns and Walls were strengthened in this California Hospital to meet the required seismic codes.

Project PDF File

Egyptian Theater

no-image

These Hollow Clay Tile (HCT) walls were overlayed with Fibrwrap for life safety and to add shear capacity. Fibrwrap can be used to prevent unreinforced masonry from becoming a falling hazard.

Project PDF File

Flyaway Parking Structure

no-image

Full confinement of beam using Fibrwrap and TYFO Fibr-Anchors.

Project PDF File

Fort Sam Houston

no-image

Brick Walls strengthened for shear in this historic building maintaining the original character of the building.

Project PDF File

Harris Hospital Parking Garage

no-image

Axial Load increase for columns using Fibrwrap for a new helipad at the hospital.

Project PDF File

Huntley Hotel

no-image

After the Northridge earthquake this Los Angeles Hotel was severely damaged. All the exterior walls and pier walls were strengthened without adding any significant weight or aesthetic change to the structure.

Project PDF File

Kaningos Hotel Greece

no-image

Fibrwrap column seismic strengthening allowed this hotel to reopen in time for the Olympics in Greece.

Project PDF File

La Sports Arena

no-image

Seismic strengthening of columns using Fibrwrap.

Project PDF File

Miami International Airport

no-image

Beams strengthened for both Shear and Flexure.

Project PDF File

Michie Stadium

no-image

Over 4,000 connection details to connect the precast seat elements, beams elements and cast-in-place columns due to seismic concerns. Use of 7 ft. long "Super" Fibr-Anchors for a connection detail.

Project PDF File

Navy Hospital Building 26

no-image

Seismic Shear Strengthening of Walls using Fibrwrap.

Project PDF File

OU Medical Center Parking

no-image

Flexural and shear strengthening of beams using Fibrwrap.

Project PDF File

Paragon Cable Building

no-image

Wood Glulam Beam strengthening.

Project PDF File

Pasadena City Hall

no-image

Seismic Retrofit of this Historic building included axial load enhancement of 100 columns using the Fibrwrap System.

Project PDF File

Pico & Overland Parking Garage

no-image

One of the very first Fibrwrap strengthening projects after the Northridge earthquake in 1994. This building was severely damaged and the Fibrwrap System was implemented as an emergency retrofit.

Project PDF File

Pillsbury Towers

no-image

38th and 39th floor strengthened for additional dead load associated with a high-density filing system.

Project PDF File

Richmond Olympic Oval

no-image

Rectified cut steel on beam during construction.

Project PDF File

Saddle Dome

no-image

Flexural Beam strengthening using the TYFO UC laminates and U-shaped Fibrwrap anchorage.

Project PDF File

Serafi Mall

no-image

Concrete repair and Fibrwrap strengthening at a mall in Mecca, Saudi Arabia.

Project PDF File

UCSD Medical Center

no-image

Square Columns strengthened for seismic shear strengthening.

Project PDF File

Wal-Mart Hawaii

no-image

Flexural Beam Strengthening for the Wal-Mart Parking Structure in Hawaii.

Project PDF File

Fox Plaza

no-image

Corrosion at balcony rail post locations was causing a dangerous spalling condition on this 20-story high rise. Concrete repair and Fibrwrap was used at each post location to prevent future spalling.

Project PDF File

Getty Villa

no-image

Flexural capacity enhancement using Fibrwrap.

Project PDF File

La Jolla Galleria

no-image

Addition of a topping slab was going to overload the existing slab. Fibrwrap was used for strengthening.

Project PDF File

Sears Lofts

no-image

This warehouse was rehabilitated for a condo conversion in downtown Oakland, California. The two-way slab was strengthened with Fibrwrap for negative moment.

Project PDF File

Zorinsky Federal Building

no-image

The cutting of an opening for a new stairwell in this two-way waffle slab created a defficiency in the system. Fibrwrap was installed to provide reinforcement around the new penetration.

Project PDF File