Mooko Harbor
Location: Donghae City, East Coast Pier, Korea
Duration: December 3, 1998 - December 31, 1999 (13 months)
Structure: Concrete Slab 16" thick, 36' wide, 450' long
Work Performed: Composite Tyfo® WEB with Tyfo® S Epoxy for Slab 33,650 sq. ft. Composite
Tyfo® SEH-51 with Tyfo® SW Epoxy for Girders 4,290 sq. ft.
Description: Only 5-6 hours work a day due to working space restraint, which was less than 2' high
between sea level and bottom of girders at low tide. Girders were sunken below sea level at high
tide. Underwater scaffolding installed.